top of page

st dympna's primary aspley australia

00000003.JPG

brisbane northside along the east-west divide that is robinson road

master plan
aspley aus
-concept: align master-planning and building design with pedagogy 
-context: school master-planned consolidation campus
-cost: undefined
-construction: formed concrete, slabs, sandstone blocks, soft & hard landscaping
-contractor: undefined
-clarification: undefined
-calendar: 07/2017

block E gla block
aspley aus
-concept: robust un-decorated materiality for architecture to recede as back-drop for end-user engagement to populate/decorate
-context: stage 1 school master-planned consolidation campus
-cost: $3,000,000.00
-construction: un-rendered blockwork; off-form concrete, slabs, galv. steelwork; soft & hard landscaping
-contractor: midson contructions
-clarification: 
-calendar: 05/2018

entry: new administration building
aspley aus
-concept: making 'back-room' activities transparent
-context: entry - face to the street upon arrival
-cost: undefined
-construction:  galv. steel portals with safety glass infill under an enclosing roof and wall plane 
-contractor: undefined
-clarification: shelter and corporate team-work
-calendar: 04/2020​

gla teaching pods:

 aspley aus
-concept: 
-context: school master-planned village campus
-cost: undefined
-construction: 
-contractor:
-clarification:  
-calendar: 06/2022